mainpage>>Central Development Authority>>Executive south Upper Egypt Development Authority

::. Executive south Upper Egypt Development Authority (ESUEDA) .:: 

 ::. Future plan  .::

Potable water &Sewage projects :
 
1- Construction of PW&S networks for Sohag Industrial zones (West of Tahta – Ahawia east –west of Girga) including the following works :
  •  Water supply works : selection of most appropr ,atc…source ,water treatment works ,construction of supply networks ,boosters and tanks .
  • Sanitary Drainage works ,including gravity lines ,force mains and plants ,sewage water treatment works .

2- Development of infrastructure works at new friendship area – Aswan Govenorate

This is a new urban community , whereby ,all principles and specifications of sound engineering planning and design shell be complied with for fulfilling the area inhabitants requirements .The project total area is 328 feddans the first phase was finalized by the Governorate . SUEDA .shall be responsible for the design and execution of the 2nd phase .The project includes : planning and construction of road ,water, sewage ,electricity ,communication networks .

3- Development of infrastructure of new Mansouriyia village –District of Draw – Governorate of Aswan .

The project includes planning and construction of road water sewage ,electricity and communication networks .

4- Construction and pavement of subsidiary roads for connection of kena Governorate villages with the trunk roads :

 Total length : about 19.7km , including .

1- connection of Abotesht city with the western road ( Aswan – Cairo ):6.4 km .
2- El Batha village road , starting with GabaLE Nur till Hemaily-farshoot road (3.5km) .
3- Connecting Thomas &Afia (village1) at Isna western (Cairo – Aswan ) road 4 km .
4- Madafin Elmansra road with Nagaa Hammady – Rodir & television and western desert road (5.8km). All project documents evere prepared by the bidding consultants . The project estimated cost , LE 14 M .

5- Construction and pavement of subsidiary roads for connection of sohag Governorate villages with the trunk roads .

Total length : about 25 km ,including the following roads :

1- On canal 3170 viaduct in Johaina till the Industrial zone ( about 12 km ) .
2- On canal 317 viaduct at johaina (about 8km )
3- Tarrad ELNil – Awlad Hamza – Al nowairat / Al Menshea (5km )

All project documents were prepared by road engineering consultant unit – Faculty of engineering – Ain shams university Estimated Total cost : LE 14 M .


  
   
   