First - Nile West Bank Project
1- Extensions of the final phase of
Gabal Asfor sewage treatment plant
For raising the total
target treatment capacity to 3mm2/d ,on Oct 1998 ,the 1.2MM3/d
first phase started whereas the second phase started with on
average treatment capacity of 500000M3/d (Oct.2004)
2- Sanitary Drainage project of
khoussos Areas and villages
(AlMonia-AlHafeer-Alboosh).
This project includes the
construction of sewage networks for unserved areas of such
villages and transmission of their discharges to Gabal Asfar
treatment plant . Its serves 1746 mullion people over 700
Hectors , with total discharge of 460000 M3/d .
3- Extensions of
Ameriyia Booster plant on the East Bank .
Main sewage Tunnel .
For reaching the maximum
capacity of 3.42 Mm3/d with total cost of LE 500 M.
Second - West Bank Project
1- Extension of Abo Rawash sewage treatment
plant for increasing the primary from 400000 M3/d to 1.2 M
total LE 700 M.
2- Extensions of volute Boosting plants At
Embaba ,Ganoob AlMoheet ,Aletsool and Abo Rowash for reaching
the capacity of 2.4 Mm3/d with total cost of LE 125 M .
Third - Helwan Sewage Project
- Updating Helwan lay out to comply with the
existing and prospective urban extensions and discharge .
- Manya villge south of Helwan .
- Extensions of kafr Mesaed Elrai and Helwan
sewage treatment plant . |