First - Nile West Bank Project
 
1- Extensions of the final phase of Gabal Asfor sewage treatment plant
For raising the total target treatment capacity to 3mm2/d ,on Oct 1998 ,the 1.2MM3/d first phase started whereas the second phase started with on average treatment capacity of 500000M3/d (Oct.2004)
2- Sanitary Drainage project of khoussos Areas and villages (AlMonia-AlHafeer-Alboosh).
This project includes the construction of sewage networks for unserved areas of such villages and transmission of their discharges to Gabal Asfar treatment plant . Its serves 1746 mullion people over 700 Hectors , with total discharge of 460000 M3/d .

3- Extensions of Ameriyia Booster plant on the East Bank .
Main sewage Tunnel .
For reaching the maximum capacity of 3.42 Mm3/d with total cost of LE 500 M.

Second - West Bank Project
 
1- Extension of Abo Rawash sewage treatment plant for increasing the primary from 400000 M3/d to 1.2 M total LE 700 M.
2- Extensions of volute Boosting plants At Embaba ,Ganoob AlMoheet ,Aletsool and Abo Rowash for reaching the capacity of 2.4 Mm3/d with total cost of LE 125 M .
 
Third - Helwan Sewage Project
 
- Updating Helwan lay out to comply with the existing and prospective urban extensions and discharge .
- Manya villge south of Helwan .
- Extensions of kafr Mesaed Elrai and Helwan sewage treatment plant .


  
   
   